On 23.3.2023, the construction of the tram loop was ceremonially launched at Pisarky depot in Brno with the participation of Mayor Markéta Vaňková. The loop will be partly laid on the bridge structure. More than 3 km of tracks and 40 pieces of switchbacks will be installed.